Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bieeorg/biee.ehstaging.net/wp-includes/functions.php on line 6170 Aldersgate Group / UCL ISR Report: A zero-carbon power grid and the electrification of heavy industry - BIEE
Warning: Trying to access array offset on false in /home/bieeorg/biee.ehstaging.net/wp-content/themes/biee-2020/single.php on line 2
Aldersgate Group / UCL ISR Report: A zero-carbon power grid and the electrification of heavy industry
Warning: Undefined variable $post_id in /home/bieeorg/biee.ehstaging.net/wp-content/themes/biee-2020/single.php on line 21
To decarbonise power and end industry’s reliance on costly fossil fuels, the UK must install around 200GW of low carbon energy infrastructure in the next 12 years. At the same time, UK heavy industry will need to increasingly run on clean and affordable electricity in order to rapidly decarbonise and remain competitive. However, the current pace of policy delivery does not meet the scale of this challenge. This report recommends a range of measures to address this.
The report outlines 15 measures to upgrade the power grid, facilitate continued investment in renewables, enable direct access to low-cost renewable power for heavy industry, accelerate low carbon innovation and support the competitiveness of UK industry.