Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bieeorg/biee.ehstaging.net/wp-includes/functions.php on line 6170 NESO: Launch of National Energy System Operator - BIEE
Warning: Trying to access array offset on false in /home/bieeorg/biee.ehstaging.net/wp-content/themes/biee-2020/single.php on line 2
NESO: Launch of National Energy System Operator
Warning: Undefined variable $post_id in /home/bieeorg/biee.ehstaging.net/wp-content/themes/biee-2020/single.php on line 21
Introducing NESO
Our increasingly complex energy system must be planned and operated in a way that considers the interactions across electricity, gas and other forms of energy. We also need to consider the interdependencies with other sectors, such as water, transport, telecommunications and industry.
Fundamental to NESO is the ability to bring an independent, impartial voice to energy system planning and operations that takes this whole system view. We’ll consider all the interrelated challenges and trade-offs and ultimately work towards optimal outcomes for energy consumers.
We bring together eight activities required to deliver the plans, markets and operations of the energy system of today and the future. Bringing these activities together in one organisation encourages holistic thinking on the most cost-efficient and sustainable solutions to the needs of our customers.
Comments for BIEE Members only.
Sign in or become a member today.