Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bieeorg/biee.ehstaging.net/wp-includes/functions.php on line 6170 NIC: Electricity distribution networks: Creating capacity for the future - BIEE
Warning: Trying to access array offset on false in /home/bieeorg/biee.ehstaging.net/wp-content/themes/biee-2020/single.php on line 2
NIC: Electricity distribution networks: Creating capacity for the future
Warning: Undefined variable $post_id in /home/bieeorg/biee.ehstaging.net/wp-content/themes/biee-2020/single.php on line 21
Final report of the NIC study on the steps necessary to ensure Britain’s low-voltage electricity networks can keep pace with rising demand.
The energy transition means Great Britain’s electricity distribution network is becoming increasingly important. As the country makes progress towards its net zero target, the distribution network will be a key enabler of electrifying heat and transport, and will support the decarbonisation of the power sector by connecting new sources of generation. This will fundamentally change the role of the network. Continuing a steady state approach will not be sufficient to meet future demand or deliver benefits, such as enabling economic growth and development.
Comments for BIEE Members only.
Sign in or become a member today.